Due to rain and fog 12 flights canceled and many trains delayed, passengers created ruckus at the airport

On Thursday, 12 flights from Lal Bahadur Shastri International Airport to and from various places were canceled due to rain and fog. Over 2160 passengers have to deal with issues as a result. This infuriated the travelers, who raised a fuss at the airport.

There were further delays on Indigo’s flights to Ahmedabad, Goa, Bhubaneshwar, and Mumbai on Akasa Air, and Sharjah on Air India Express.

Fog slowed down many trains

On Thursday, the Darbhanga-Ahmedabad Antyodaya Express arrived 18.30 hours later than expected. The Dehradun-Howrah Upasana Express was 13 hours late.

Jansadharan Express Danapur-Anand Vihar Terminal is 11 hours, Gorakhpur-LTT Express is 10 hours, Anand Vihar Terminal-Danapur is 9 hours, LTT-Gorakhpur Weekly Express is 6 hours, Howrah-Dehradun Kumbh Express is 4.30 hours, Gondia-Barauni Express is 4 hours, Pune-Darbhanga Express arrived at Cantt station 3.45 hours later than expected, and Bahraich-Varanasi City Intercity Express is two hours late. Riders endured hours of waiting due to delayed trains.

PM Narendra Modi inaugurates Veer Savarkar Airport in Port Blair

Through video conference today, July 18, Prime Minister Narendra Modi officially opened the new integrated terminal building at Veer Savarkar International Airport, Port Blair.

Jyotiraditya Scindia, the minister of civil aviation, also took part in this event. He unveiled the Vinayak Damodar Savarkar statue in Port Blair before the inauguration.

Jyotiraditya Scindia, the minister of civil aviation, announced before the event that the Veer Savarkar Airport, which cost Rs 710 crore to build, is being dedicated to the country today. This terminal, which was constructed in an area of around 40,800 square meters, can accommodate 50 lakh passengers a year.

PM Narendra Modi will inaugurate the new Integrated Terminal Building of Chennai Airport on 8 April

On April 8, 2023, Prime Minister Narendra Modi will officially open the Chennai Airport’s new integrated terminal building. The new terminal, T-2 (Phase-1), has been built over a 1,36,295 square meter area, and it cost Rs 1260 crore to complete.

The new structure will raise the airport’s current 23 Million Passenger Per Annum (MPPA) capacity to 30 MPPA with the purpose of serving more passengers.

The new terminal, according to the official statement, is a remarkable representation of the local Tamil culture, including customary characteristics like the Kolam (a pattern or design drawn in front of South Indian dwellings), saris, temples, and other things that emphasize the surrounding landscape.

Crowd will not be found at Delhi Airport, know what major changes have happened at Terminal-3

On Wednesday morning, travelers moved without difficulty through all of Terminal 3’s entry gates at Delhi’s Indira Gandhi International (IGI) Airport. The average wait time was now under five minutes.

Related Post – How to Make Nail Polish Dry Faster – 6 Tips To Dry Your Nail Polish Ultra Fast

Both Indigo and Air India asked customers to come three and a half hours before the flight in travel advisories they both issued on Tuesday. For a quick security check, both airlines advised customers to only bring one piece of cabin luggage.

The Delhi airport is experiencing an increase in customers, according to the airlines, which is taking longer for boarding and check-in. For domestic flights, passengers must arrive 3.5 hours in advance, while for international flights, they must arrive 4 hours in advance. They should also only bring one cabin bag for the security check.

The Delhi Airport advised using Digi Yatra for a better experience. And no T3 gate has a wait time of more than five minutes.

In light of the massive throng at the Delhi airport, this warning has been given. On social media, travelers documented the lengthy lines and large crowds at the airport. On Monday, the authorities developed a fresh strategy in response. Jyotiraditya Scindia, the minister of civil aviation, arrived at Terminal 3 after the action plan to survey the setup.

In the meanwhile, the Ministry of Civil Aviation has sent a letter to all airlines on airport congestion, requesting that they provide real-time information on their social media pages regarding the wait times at certain airport entrance gates to help customers avoid difficulties.

In order to reduce congestion at airports and ensure smooth passenger flow, the ministry advised airlines to pre-deploy all check-in counters with adequate staff.

Related Post – Top Professional Hairstylists In Kolkata

Abhishek Bachchan, Aishwarya Rai leaving for Paris with daughter Aaradhya, see airport pics

After the Coronavirus pandemic, Abhishek Bachchan and Aishwarya Rai are headed to Paris. The couple and their daughter, Aaradhya, were spotted at the Mumbai airport.

Related Post – How to Download Covid-19 Vaccination Certificate from Co-WIN, UMANG and Aarogya Setu App

Although Abhishek was wearing a tracksuit, Aishwarya was wearing her usual black outfit while holding her daughter, who opted to wear the face shield to keep safe.

Morphed wedding images were recently posted on the internet featuring Aishwarya and Abhishek. Social media users posted images that they said were photoshopped, as well.

An injured hand has been bothering Abhishek for several weeks. Having completed her Ponniyin Selvan shoot, Aishwarya decided to go on a trip to Paris with him. Her Instagram account recently featured the poster for the film. The movie will be released in 2022.

Related Post – How to Start a Blog and Make Money in 4 Easy Steps

Vikram, Karthi, Trisha Krishnan, Prakash Raj, Jayaram, Jayam Ravi and Aishwarya Lekshmi are some of the actors who will appear in the magnum opus, which began filming in December 2019.

Exit mobile version